WM Events were asked to supply and install the interior fit out for a temporary classroom facility whilst the existing classrooms and dining hall are being refurbished. The interior was installed to meet local building regulations with regard to insulation and fire precaution.
Grid suspended ceilings were installed throughout the classrooms along with fire rated walls and doors. The install was designed to be in place for at least 18 months.